Welcome to PPI

Turning Unique Challenges into Predictable Outcomes

Take the Free Assessment

About Us

Progressive Plan International Inc. (PPI) is an Operational Execution Consultancy headquartered in Western Canada, supporting complex work across public and private sectors. Built on a foundation in industrial shutdowns, turnarounds, and outages (STOs), PPI's practice extends to project management across a wider range of industrial and heavy-industry work.

 

PPI's product is not scheduling hours, project controls staff, or software. It is an execution operating system: the governance structures, planning discipline, and lifecycle logic that let industrial organizations execute major work with predictability, control, and growing internal capability. PPI remains agnostic to any specific technology platform, applying whichever tools best serve a client's execution system.

 

PPI collaborates with clients, general contractors, and specialty vendors to build partnerships around shared outcomes. Its dedication to mentorship, structured practice, and the Dynamic Scheduling Methodology (DSM) helps clients achieve efficient, cost-effective, and predictable turnaround outcomes.

Addressing Challenges in Industrial STO Events

Industrial STOs are pivotal events for maintenance and upgrades in asset-intensive sectors such as oil and gas, refining, petrochemical, power generation, food processing, and heavy industrial manufacturing. These events are complex, and they frequently overrun on both cost and schedule. Turnarounds often suffer from fragmented scoping, inconsistent planning, and poor execution alignment across stakeholders. These issues are compounded by constrained timelines, contractor misalignment, and underutilized scheduling tools.

 

Industry data highlights the urgency for reform:

 

     - Over 80% of turnarounds exceed budget by more than 10%

     - 82% fail to meet performance objectives

     - Nearly 50% of industrial incidents occur during shutdowns or maintenance outages

     - Despite 98% documenting lessons learned, only 42% actively implement them

 

The price of getting it wrong is also climbing. Siemens estimates that unplanned downtime costs the world’s 500 largest companies about 11% of revenue, roughly USD 1.4 trillion a year, and a large heavy-industry plant about USD 59 million a year, 1.6 times its 2019 level.  In oil and gas, the cost tracks the oil price, so exposure peaks when margins are strongest. An STO event that runs past its window turns planned outage days into lost production that was never in the plan.

 

These are industry averages. Where your own practice sits is a different question, and a more useful one. See where your turnaround practice stands.

 

Delays in decision-making, late contractor engagement, scope creep, and schedule rigidity are system problems, not people problems. Most are built into the event before the window opens and only become visible once execution starts. Addressing them takes two disciplines: proving the schedule is executable before the event, and controlling the event once it is live.

 

Before the window opens: Schedule Readiness Review 

Once the event is live: In-Event Critical Mass Control 

* Data Sources

1)  TA Cook and Solomon Associates (2019)

2)  Cleopatra STO Survey (2024)

3)  Siemens, The True Cost of Downtime (2024)

Turnaround Excellence Framework

Find the gaps before the turnaround window opens

 

Many turnaround losses are created long before field execution begins, in decisions about premise, scope, planning, and readiness. PPI's Turnaround Excellence Framework is a lifecycle-based operating model for shutdowns, turnarounds, and outages that connects strategy, governance, scope, planning, scheduling, readiness, execution, and continuous improvement, so the strengths and weaknesses in your turnaround system become measurable rather than anecdotal.

 

Start with a free assessment of your current practice. In about ten minutes you will have a directional maturity read and a clear next step, from a deeper self-assessment through to a PPI-guided review using your own event data.

 

The framework also shapes two services that work directly on your event data: a Schedule Readiness Review, which tests whether the schedule can carry the event before mobilization, and In-Event Critical Mass Control, which keeps the event on its plan once the work is under way.

Assess Your Turnaround Practice Explore the Framework

Reliability-to-Execution

Where your asset strategy meets the turnaround window

 

Much of the work in a turnaround starts in the reliability and asset-management system: inspection and integrity findings, deferred work, and the interval decisions that set when the window opens. When that system and the turnaround are run as separate programs, the gap shows up later as late scope, found work, and work-packages built on incomplete asset data. Schedule quality is bounded by what flows in upstream: Gold In → Gold Out.

 

PPI’s Reliability-to-Execution assessments test that hand-off from the asset-management side. Drawing on PPI’s shutdown, turnaround, and outage (STO) practice, they show whether your reliability program produces work the turnaround can plan, schedule, and execute, and where it does not. Questions are cross-referenced to the GFMAM (Global Forum on Maintenance and Asset Management) Asset Management Landscape, so results speak the language your program already uses.

 

Start with the free eight-question self-assessment for a directional read, then the 24-question deep dive for a fuller picture.

Assess Your Reliability Program Explore the Framework

Our Approach

PPI’s approach is governed by the Turnaround Excellence Framework, a unified lifecycle model that makes turnaround performance measurable from strategic premise through execution, closeout, and continuous improvement. The framework identifies where intervention is needed. The following seven components of PPI’s execution operating system provide the response, in lifecycle order.

 

1) Practical Management of Plant Turnarounds (PMPT): Structured training and implementation support to define the turnaround premise, align roles and responsibilities, and embed readiness and gate-based assurance milestones. 

 

2) Plan2Plan (P2P) Playbook Development: Co-development of a milestone-based planning framework that aligns Operations, Capital, Maintenance, and Contractors around shared deliverables, timelines, and compliance metrics.

 

3) Scope Challenge (J-Factor): A facilitated, auditable risk-based work selection (RBWS) process that challenges every proposed work-package before scope freezes. Must-do work is separated first, the rest is rated in a Risk-Based Scope Review, and each rated item is tested for its J-Factor: the risk it removes for each dollar spent, against the hurdle set for its risk category. After freeze, Added Work and Found Work go through the same tests as they arrive.

 

4) Dynamic Scheduling Methodology (DSM): Training and mentorship in DSM to establish systematized, logic-driven, float-optimized, and execution-responsive schedules. This includes schedule audit frameworks and resource-loaded planning structures to enhance scheduling maturity.

 

5) AI-Driven Schedule Optimization with ALICE Core: Deployment of ALICE Core to enable parametric optioneering and scenario analysis. DSM serves as the foundation for high-quality inputs (“Gold In, Gold Out”), delivering scalable, AI-enhanced planning options.

 

6) Work Process Reviews and Assurance Activities: Independent analysis of current turnaround workflows and readiness reviews aligned with Plan2Plan milestones. Schedule health checks are delivered as the Schedule Readiness Review: each development cycle, a PPI scheduler screens your Primavera P6 schedule for structural health, plan health against PPI’s schedule development standards, and forecast readiness, then works the findings with your team until the schedule is a baseline candidate.

 

7) In-Event Critical Mass Control: Control of the live event from the daily P6 update your scheduler already produces. Each update shows whether the finish is still set by logic or has become set by crew throughput, and flags bulk scope running past its target as an early warning of critical mass trouble. For each primary craft, remaining hours become a headcount forecast and a calculated step-down, so hold-or-release decisions are made craft by craft rather than on an event-wide curve. Outputs feed both tiers of the event’s Rhythm, with blockers carried on a single Constraint Log.

 

The scope of work is structured across delivery phases, each building capability while reinforcing long-term planning discipline and internal ownership. The modular structure is designed to fit your turnaround planning cycle and organizational structure.

 

Each component builds internal capability alongside the event itself, so the execution system, and the discipline behind it, stays with your organization after PPI’s engagement ends.

Contact Us

© 2026 Progressive Plan International Inc. | Headquartered in Western Canada